What you get back
By email, usually the same day.
- The permitted route, traced turn by turn and checked against the permit's own mileage and exit list.
- Every overpass on the route with its listed clearance against your load height, sorted into STOP/VERIFY TIGHT and WATCH.
- Bridges to know about: narrow decks, load-posted, poor-condition and scour-critical bridges the load crosses.
- Tight ramp turns measured from map geometry.
- Permit rules on the map: curfews, required detours and scale houses placed at their mile.
- A move-day timing plan with daylight windows.
- Files for the cab: a Google Earth KML, a GPX that imports into InRoute, a Google Maps link, and a summary page that reads well on a phone.
What a clearance list looks like
SAMPLE ONLY: fictional route and numbers
Not a real permit, road or bridge. Load height in this example: 14 ft 6 in.
| Mile | Structure | Listed clearance | Call |
|---|---|---|---|
| Mile 12.4 | Example County Rd overpass | 14 ft 4 in | STOP/VERIFY |
| Mile 37.9 | Example rail overpass | 14 ft 10 in | TIGHT |
| Mile 58.1 | Example interchange flyover | 15 ft 9 in | WATCH |
Data sources: the FHWA National Bridge Inventory and OpenStreetMap, cross-checked against your permit.
Read this before you rely on it. Clearances are inventory minimums, not measured. A route survey does not replace a height-pole run or the day-of 511 check.
How ordering works
- Fill in the order form below, or email the permit and load details to support@nextgearwebservices.com.
- Email your permit PDF(s) with your order number.
- We confirm the order and send a payment request. We take card, Zelle or Venmo.
- Your survey arrives by email.
Turnaround
Same day for most routes when the permits arrive before noon Central.
One survey covers one state permit set and one load. A move through three states with three permits is three surveys.
Order a route survey
$99.99 per route. Nothing is charged here; we send a payment request when we confirm the order.